| 摘要: |
| 本文探讨了基于任务图的并行程序设计方法的后半部分─—按照任务图选择拓扑结构和将并行算法映射到并行结构上. |
| 关键词: 任务图 并行程序设计方法 映射 |
| DOI: |
| 分类号: |
| 基金项目:本研究得到国家863高技术计划资助. |
|
| A METHOD OF PARALLEL PROGRAM DESIGN BASED ON TASK GRAPH(Ⅱ)──CHOOSE TOPOLOGICAL STRUCTURE |
|
Wu Qiaoquan,Shen Ping,Zhang Defu
|
| Abstract: |
| This paper has presented a method of parallel program design based on task graph and discussed design of task graph. In this paper, the authors develop letter half of the method for choosing topological structure by task graph and mapping parallel algorithm to parallel architecture. |
| Key words: Task graph method of parallel program design mapping. |